Home - Return to Previous Page
Click on image to zoom

Dynomite Diesel Products Stage 2 Injector SET (26LPM) *With Long Lead* For 1999-2003 6.0L FORD POWERSTROKE

DDP AE-2
Was: $2,800.00
Sale: $2,660.00
Save: 5%
Save: $140.00

Customize Your Item

- $1200 Core Charge -
 * required
Qty:
Free Shipping!

Description

Ford 99-03 7.3L Powerstroke Injector SET: WITH LONG LEAD. Approximately 75 RWHP over stock. Similar in size to a 140cc with 40% nozzles. Excellent choice for a street performance truck.

Details

Shipping Information

  • Item Requires Shipping
  • 27.0 lbs.
  • W17.0000” x H9.0000” x L12.0000”
  • Free Shipping!

Customer Reviews

Comment Total Reviews (0)

Write the First Review!

You must login to post a review.